| Commit message (Collapse) | Author | Age | Files | Lines |
| | |
|
| | |
|
| | |
|
| |
|
|
| |
control
|
| | |
|
| | |
|
| |
|
|
|
|
|
|
|
|
| |
============================
Arc head - activate arc heaters gradually
stop FPGA Reinit after 20 trials
Head cleaning - move actuators (with stub - 0xAD7)
fix RML PID support
head open prevent job - (with stub - 0xAD6)
add stub to overrule cone missing - 0xAD8
|
| | |
|
| | |
|
| | |
|
| |
|
|
| |
alarms, safety, auto filling dispensers
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
=============================================================
System:
File system protection + improvements
Keep critical data on MCU EEPROM
Procedures:
Thread load
fix and coordinate the amount of thread in drier to the distance to spool length.
Dispensers flow control stage 2a - maintain pressure during presegment
Modules:
Enclosure temperature alarms
Secondary waste pump
Dispensers state info
Heaters protection improved
Diagnostics data - full data, full speed for now
Thread - fix length calculation
Process:
Cleaning ready for integration
|
| |
|
|
| |
improved and simplified dispenser location. improved config parameters handling
|
| |
|
|
| |
on machine start
|
| |
|
|
| |
lubricant handled better
|
| | |
|
| |
|
|
|
|
|
|
|
| |
File upload: prevent on job, reduce priority (watchdog)
Report: packages filters introduced, please feel free to use them.
robustness in communication improved
large number of segments and gradient support - initial
at the end of job the screw does not return back
rockers - adjust values before and after loading the cart
|
| |\ |
|
| | | |
|
| |/ |
|
| | |
|
| | |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
====================================
1. preparations for keeping data in internal flash
2. keep applicative data in external flash: software parameters, dispensers data, etc.
3. moved to new alarms definitions, tamper alarms, improved temperature alarms, cone presence alarm,
4. support for Machine Studio 4
5. some tests for memory allocations
6. thread load proto code
7. Hardware: doors tampering switches, drier fan, blower PWM control, new backplane support, new motor drivers support,
8. FPGA jtag code loading
9. Heaters: alarms on set temperature band. test facilities.
10. motors - additional complex actions for thread load support. new drivers support
11. preparations for control debugging
12. read motor status and mid tank level
13. collect and store dispenser usage data
14. IDS - controlled operation of motor and valve. backlash movement after refill
15. bug fixes in job handling
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| |
Communication tx traces (reports, diagnostics, alarms, job reports)
File system file download support – not tested!
Communication tx with pre-allocated memory (improve and add areas)
Winder Screw – send messages in regular mode
Preparation for motor actions timeouts
Preparations for control debug
Heaters: bug fix, enlarge PID start region
IDS:
• Dispenser time out between motor operation and valve operation (start->open. Close->stop).
• Dispenser homing backlash – to pressure above limit (currently 0.1 for machines without mixer) or timeout (10 seconds).
State machine – Suspend Large Messages cancelled.
|
| | |
|
| | |
|
| | |
|
| | |
|
| |
|